High-Level Glass Replacement Safety Requirements in the UKHigh-level glass replacement in commercial buildings demands strict compliance with UK safety legislation protecting both workers and building occupants.
Rope Access vs Scaffolding for Commercial GlazingRope access, commercial glazing projects across the UK, are delivering substantial cost savings and operational advantages over traditional scaffolding.
Heathrow AirportGlazing Refurbishment were required to replace 576 identified defective Georgian wired glass panels on various locations to the Northlights above the three aircraft holding Penns.
GR were asked to design and install a new glass balustrading solution for this Midlands based School.The brief/scope of the scheme was to either alter the existing balustrade height which was a standard 1100mm high.