Emergency glazing starts with making the building safe, secure and weathertight, usually within hours. Replacing the glass comes later, once the right unit has been made. GLRE provides emergency make safe and reactive glazing across the UK.
Anything that is stable, secure and weathertight is not an emergency, and treating it as one costs more and slows the genuine calls.
Steps one to four are the make safe. Step five is where most of the calendar time goes, and it is driven by glass manufacture rather than by the contractor.
It depends on where the building is, what time it is, whether a team is already deployed, and what the site needs to admit a crew out of hours. Any contractor publishing a single response time is describing a good day.
If a guaranteed response matters to your organisation, it belongs in a service level agreement, where the time is specified, priced, bounded by location and hours, and backed by an escalation route. That is what a reactive glazing agreement is for. See emergency and reactive glazing services.
Timber or steel sheeting fixed over the opening. The most secure option and the least acceptable in a trading frontage, which is why it is usually the overnight answer rather than the week-long one.
Sheeting and sealing to keep water out where the opening cannot be boarded, for example on an overhead or high-level element.
Where the glass is cracked but still in place and stable, high-performance film can hold it together and keep the building trading until the replacement arrives. It is the least disruptive option and the most often overlooked. See high-performance glazing film.
Where glass is overhead and cannot be removed immediately, netting beneath contains anything that falls and allows the space below to stay in use. See safety netting.
Until the replacement glass arrives, which depends entirely on the specification. A standard clear unit in a common size is quick. Toughened, laminated, fire-rated, acoustic, coated or oversized glass is made to order and will take longer, sometimes considerably.
Ask for the glass lead time at the make safe visit rather than at the follow-up. It is the number that determines everything else. See commercial glass replacement process and commercial glass replacements.
GLRE cannot advise on the terms of a policy. What it can do is provide the documentation an insurer will ask for.
No, and this is the most common misunderstanding after an emergency call-out. A make safe stops the situation getting worse. It does not restore the building, it is not designed to last, and the permanent repair is a separate scope with its own survey, specification and price.
The process from the facilities manager's side is set out in emergency make safe for facilities managers, and overhead emergencies in atrium glazing repair guide.
All work at height is planned and supervised under the Work at Height Regulations 2005, and replacement glass in critical locations must meet the impact requirements in Approved Document K.
Want an agreed response rather than a search at midnight? Book a reactive glazing agreement.
Refurb House,
11 Minton Enterprise Park,
Oaks Drive,
Newmarket,
CB8 7YY
We use cookies to provide you with the best possible experience. They also allow us to analyze user behavior in order to constantly improve the website for you.
See our Privacy Policy